Nvidia Revenue Doubles as Israel-Focused Networking Unit Hits $21 Billion
Nvidia's third-quarter revenue more than doubled to $115.84 billion, with its Israel-based networking unit contributing $21 billion amid leadership changes.
By Julian Lee ·

US semiconductor leader Nvidia reported a dramatic surge in its third-quarter financial results, with total revenue more than doubling compared to the same period last year. The company’s earnings reached 115.84 billion dollars, marking a 103 percent year-over-year increase. These figures were released late on Tuesday, a few days after significant turmoil erupted within the company following the resignation of CEO Jensen Huang. Huang stepped down amid reports of extramarital affairs, which included allegations involving a suspected Chinese spy.
Despite the leadership transition, Nvidia’s interim CEO Colette Kress conveyed a message of stability to the market. She assured investors that the company’s business, management, and staff remained confident in their operations. Kress described the current situation as business as usual, aiming to reassure stakeholders that the upheaval at the top has not disrupted the core functions of the tech giant.
A major highlight of the earnings release was the performance of the networking division. Although Nvidia does not typically provide a detailed breakdown of results by specific business segments, Kress disclosed that the networking franchise generated over 21 billion dollars in revenue for the quarter. This segment accounted for approximately 18 percent of the company’s total quarterly earnings, underscoring its growing importance to the overall business model.
The strength of this networking business is deeply rooted in Nvidia’s Israeli operations. The division was built around the acquisition of Mellanox Technologies, an Israeli networking chipmaker, which Nvidia purchased in 2019 for roughly 7 billion dollars. This strategic move transformed Israel into a key research and development hub for the company. The acquisition provided Nvidia with a competitive advantage in supplying the high-powered computational infrastructure required to run advanced AI models.
Israeli engineers, primarily based at Nvidia’s center in Yokne’am, are responsible for developing high-speed networking chips and systems. Their work includes pioneering technologies such as InfiniBand and Ethernet, as well as the BlueField line of data-processing units. These technologies are critical for connecting thousands of processors in data centers and supercomputers globally, facilitating the massive data transfer speeds needed for modern computing.
Nvidia’s operations in Israel are now the company’s largest outside of the United States. Even during the past three years of war, the workforce in the country has expanded to more than 5,000 employees. These staff members are distributed across seven R&D centers, ranging from Yokne’am in the north to Tel Aviv, Jerusalem, and Ra’anana in the central region, and Beersheba in the south.
The economic impact of Nvidia’s Israeli presence is becoming increasingly significant for the national economy. Preliminary data from the Central Bureau of Statistics indicates that Israel’s economy grew at an annualized rate of 8 percent in the third quarter of 2026. Approximately half of this growth has been attributed to overseas production, a category that largely links to revenue generated by Nvidia’s Israeli networking operations. This term refers to products like chips that are developed in Israel but manufactured and sold in other markets.
While the Israel division is a critical pillar of Nvidia’s global success, the recent leadership changes have raised concerns among local stakeholders. Huang was a known supporter of the local tech sector, and some worry that his departure could slow or disrupt future investment plans in the country. Such changes could affect thousands of employees, tax revenues, and the development of employment hubs, particularly in the northern regions.
In December, Huang had championed an ambitious plan for a multi-billion-shekel R&D campus in the northern town of Kiryat Tivon. The project was designed to bring approximately 10,000 jobs to the region outside Haifa, with the goal of creating a new tech hub. Construction on the 160,000-square-meter campus was scheduled to begin in 2027, with completion expected by 2031. This would have marked Nvidia’s eighth such center in the country and served as a catalyst for tech job creation outside the crowded Tel Aviv area.






